Forty years of industrial process systems
For forty years we have built the hardware that energy producers rely on. It started in Notodden, with systems that take the oxygen out of injection water without chemicals, delivered to platforms worldwide.
Five generations since 1991, and the first, delivered to Snorre A, is still running. Today it covers water treatment, gas treatment, hydrogen purification and complete plants.
Systems
The systems this industry uses
All systems
→

→
Minox® Tower
Minox®
Counter-current stripping over structured packing, at atmospheric or positive pressure.

→
Minox 2-Stage
Minox®
Two-stage nitrogen stripping in a closed loop, without scavenger chemicals.

→
Vacuum & Fuel gas
Minox®
Rebuilds a vacuum or fuel gas tower to run on ultra-pure nitrogen.

→
Gas treatment
Minox®
Dehydration, nitrogen upgrade, scrubbers and gas washing.
Minox Studies
From early screening
to FEED-level studies
OEM process know-how in your earliest decisions. We help operators and EPCs select, size and de-risk oxygen removal and gas treatment, from water injection to CO₂ and hydrogen, and carry that knowledge into execution.
Feasibility
Screening
The right technology, early
Technology screening & selection
Feed analysis & oxygen specification
Chemical-free vs. scavenger review
Order-of-magnitude CAPEX / OPEX
Concept select
Concept
A robust, fit-for-purpose concept
Configuration & sizing options
Weight, footprint & layout studies
Utility & energy balance
Brownfield fit & debottlenecking
Pre-FEED & FEED
FEED
A defined scope, ready for execution
Heat & mass balances, PFDs, P&IDs
Equipment datasheets & specs
Dynamic simulation & HAZOP support
Cost estimate & delivery schedule
Applications
Water deaeration
Water injection
CO₂ conditioning
Hydrogen purity
Process simulation
Minox Projects
From contract award
to start-up
We own the complete delivery: project management, engineering, procurement, fabrication management, testing and documentation. Fabrication is done by qualified partner yards under our supervision and our own QA/QC.
Step 01
Engineering
One owner of the design
Project management & interfaces
Process design & heat/mass balances
Mechanical, piping, I/E & control
Procurement of main components
Step 02
Fabrication
Quality controlled by the OEM
Fabrication at qualified partner yards
Fabrication follow-up & expediting
QA/QC, ITP review & inspections
Mechanical completion
Step 03
Delivery
Ready for start-up
Factory acceptance test (FAT)
Ex Works delivery
Complete documentation package
Training & commissioning support
Across the lifecycle
Commissioning
Upgrade
Remote monitoring
Training
Spares & service
Performance
What it delivers
Nitrogen purity
99.995%
Oxygen
Below 10 ppb
Vacuum pumps
None
Scavenger chemicals
None
Footprint and weight
Half the footprint and a third of the weight of earlier systems
Retrofits
Lift capacity up to 75%
Track record
Three cases, one number each
The full reference list
→
Service
We stay
In the field
Service centres in Notodden and Port Harcourt
Agents on four continents
24-hour response
On the screen
Remote monitoring
Digital twin
24/7 monitoring
Three levels
Essential
Connected
Integrated